Drilling works with core recovery from the Imperial Tarraco geothermal station (SXGT14), recovery core box and hybrid cable coil of optical fiber and copper cable. Construction scheme of the open geothermal stations with piezometers of the primary network. Non-recoverable core drilling works. Outside of one of the monitoring stations still without data collection, power and transmission devices.