
Downloading of data in a point in the secondary sub-network is being performed. Fully-equipped station in the city of Girona. Construction scheme of the open piezometers in the geothermal stations of the primary network. Insights to the inside of a monitoring station showing the instruments used for the collection of data and its ending to the main network.

3DHIP-Calculator workflow with an intuitive graphical interface

Implementation works of the monitoring network in an urban environment. On the left, drilling of a borehole for the installation of a station.
In the center, instrumentation implementation works. On the right, station prepared for the collection and transmission of data.

Situation maps of the 22 points of measurement and control of the XEGCat of Girona, Salt and Vilablareix


Example of geophysical information synthesis: Conca del Vallès (central sector) (Download PDF, Catalan)

Figure 1. Combined workflow of the direct modeling concept proposed in the GO-Forward project.